DO NOT CUT!
through flashing
or apron.
A
B
A
B
A
B
Copyright ©2012 E. I. du Pont de Nemours and Company. All Rights Reserved. Rev. 2/12 9
DuPont
Tyvek
®
Water-Resistive and Air Barriers Installation Guidelines
DuPont
Flashing Systems Integration
If windows and doors have not been installed reference the DuPont
Flashing Systems
Installation Guidelines, Installation Instructions for Windows and Doors AFTER Water-
Resistive Barrier (WRB) is Installed to prepare the rough opening.
Ifwindowsanddoorsarealreadyinstalledandashed,thenfollowtheselast2
integration steps to tie the DuPont
Tyvek
®
WRBintotheashing.
STEP 1
A. Verify that the DuPont
Tyvek
®
WRB is properly shingled with the bottom of the
apron.
B. Cut as shown to expose window and apron. DO NOT CUT THROUGH FLASHING
OR APRON.
STEP 2
A. Tape all seams as shown. DO NOT TAPE at bottom of window.
B. At the head, continuous tape seams as shown with DuPont
Tyvek
®
Tape. Skip-taping
at the head is acceptable if an air barrier is not required or if additional drainage is
desired.